In order to improve the boiler efficiency, the header boiler is gradually developed into a tube boiler to increase the heat transfer area. The boiler water flows from the drum to the lower box through the downcomer, and it distributed to each tube bundle by the box. The water in these tube bundles continuously absorbs heat energy, and then flows back to the drum after being collected into the upper header. The upper and lower header are called headers. The header is an important part of the boiler, which is divided into upper header and lower header.
Diameter(OD) |
¢76mm~¢914mm |
Length(Max) |
23000mm |
Temperature(ºC) |
23000mm |
Brand |
Hua Dong Boiler |
·For special cargos, such as overlength, overwidth, overheight and overweight cargos, we will choose frame boxes for easy handling.
·For regular goods, we prefer ordinary containers.
·After loading the goods, we will reinforce them in all aspects.
Zhangjiagang Hua Dong Boiler Co., Ltd.,
founded in 1985, is an enterprise specializing in manufacturing power station boilers, industrial boilers, HRSGs, waste incineration boilers, biomass boilers and related heating surface components in China. Hua Dong Boiler provides clients with integrated services from design, manufacturing to installation and maintenance.
38 years experience in industry research, development and manufacturing with sufficient production capacity.
Quality Control
1. Impact test and Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and electrode
3. X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler
4. Hydraulic test report: ensure the standard working pressure and safety.
Complete quality assurance and control system which certified according to the International Quality Standard.
Establish a quality assurance system faithfully in compliance with the national regulations, standards and other technical requirements. The quality of process and products is 100% under control. Ensured all the products are manufactured faithfully in accordance with the contract requirements, national regulations and standards by stringent inspection and test over materials and products during manufacturing.
Q1: How long is the warranty period?
We provide 18 months warranty for all spare parts(exclude fragile parts).
Q2: How can we guarantee quality?
1) All machines are in strict accordance with the ISO quality and CE system requirements.
2) Each procedure is crafted by professional Skilled labour, followed by particular QC
3) All information of our products can be checked in efficient management system.
Q3: What can you buy from us?
CFB Boiler, HRSG Boiler, Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler superheater, Boiler membrane wall,
Boiler manifold headers and other pressure spare parts.
Q4: What kind of service do you provide?
Before sales:
Provide productinformations, market research forecasting, product customization,product processing,consultation and other services for your convenience.
After sales:
1. Technical training on according to customer requirements;
2. We promise replacement under warranty;
3. We promise to supply the maintenance spare parts;
4. Regular call back or visit customers;
5. On time response to mail and phone calls of your complaints or consultation.
Accepted Delivery Terms: FOB, CFR, CIF, EXW, FCA;
Accepted Payment Currency: USD, CNY;
Accepted Payment Type: T/T, L/C, MoneyGram, Western Union, Cash;
Language Spoken:English,Chinese
Q5: Are you a factory or trading company, where are you located?
We are a factory, just 130km(2 hours by car) away from Shanghai Airport.
We offer pickup service at Shanghai for your visit.