Product Description
Economizer tube is an important part of boiler, which is mainly made of seamless steel tube by bending or folding.
Cast iron economizer consists of a series of horizontal cast iron pipes connected to each other with cast iron elbows and flanged ends.
The tubular economizer consists of a series of parallel serpentine tubes, which are made of seamless steel pipes with an outer diameter of 25 ~ 42 mm, and the pipes are usually arranged in a staggered arrangement.
Detailed Photos
Product Parameters
|
Description |
Boiler economizer |
Material of Base Tube |
SA210A1 |
Material standard |
ASTM |
Dimension |
Customization |
Weight |
Min: 10 ton
Max.:1000 ton |
|
|
Process |
Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames |
|
|
FAQ
Q1: How long is the warranty period?
We provide 18 months warranty for all spare parts(exclude fragile parts).
Q2: How can we guarantee quality?
1) All machines are in strict accordance with the ISO quality and CE system requirements.
2) Each procedure is crafted by professional Skilled labour, followed by particular QC
3) All information of our products can be checked in efficient management system.
Q3: What can you buy from us?
CFB Boiler, HRSG Boiler, Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler superheater, Boiler membrane wall,
Boiler manifold headers and other pressure spare parts.
Q4: What kind of service do you provide?
Before sales:
Provide productinformations, market research forecasting, product customization,product processing,consultation and other services for your convenience.
After sales:
1. Technical training on according to customer requirements;
2. We promise replacement under warranty;
3. We promise to supply the maintenance spare parts;
4. Regular call back or visit customers;
5. On time response to mail and phone calls of your complaints or consultation.
Accepted Delivery Terms: FOB, CFR, CIF, EXW, FCA;
Accepted Payment Currency: USD, CNY;
Accepted Payment Type: T/T, L/C, MoneyGram, Western Union, Cash;
Language Spoken:English,Chinese
Q5: Are you a factory or trading company, where are you located?
We are a factory, just 130km(2 hours by car) away from Shanghai Airport.
We offer pickup service at Shanghai for your visit.