• Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler
  • Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler
  • Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler
  • Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler
  • Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler
  • Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler

Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler

Certification: ISO, ASME
Customized: Customized
Surface Treatment: Painted
Fuel: Biomass, Coal, Gas, Waste
Range of Applications: Power station, Industrial
Type: Heating Element
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2024

Suppliers with verified business licenses

Jiangsu, China
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Standardized quality control
The supplier has a complete and standardized quality control process, check the Audit Report for more information
R&D Capabilities
The supplier has 10 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (25)
  • Overview
  • Product Description
  • Product Parameters
  • Packaging & Shipping
  • Company Profile
  • Our Advantages
  • Certifications
  • Global Sales
  • FAQ
Overview

Basic Info.

Model NO.
02 Boiler economizer
Material
Stainless Steel, Carbon Steel, Alloy Steel
Machinery Test Report
Provide
Supply Ability
500 Tons Per Month
Structure
Water Tube
Application
Industrial / Power Station
Transport Package
Iron Frame
Specification
Customized
Trademark
HD BOILER
Origin
China
HS Code
8402900000

Product Description




 

Product Description

Boiler economizers are heat exchange devices with finned tubes that heat a liquid, sometimes water, up to however sometimes doesn't exceed the boiling purpose of liquid. We can manufacture three types of boiler economizer, bare tube economizer, H finned tube economizer and spiral finned tube economizer. H-finned tube economizer is high efficient heat exchanger economizer which is consisted of H-finned tubes.


Compared with bare tube economizer, H-finned tube economizer can enlarge the heat exchange area and reduce the number of tubes. It also can increase the flue gas flow area in order to reduce the flue gas flow speed and abrasion.
H-finned tube can be made as double H finned tubes , with high rigidness to fit long tube row.
The spiral finned economizer is a newly designed heat transfer equipment, consists of spiral fin tubes to overcome the serious abrasion and short service time.

Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler

The function of the economizer is as its name implies, to "economize" or save on cooling costs. Obviously, it costs money to operate the compressor. If the compressor can be shut down and the system still provide adequate cooling, energy savings can be realized.

(1) HDB consistently executes successful boiler economizer installations using safe, cost-effective methods. Economizers improve boiler performance by increasing fuel efficiency and improving steam generation and response time.
(2) We can guide you through the process of installing or retrofitting existing boiler systems . Our expert boiler economizer and waste heat recovery system installations can reduce your overall fuel requirements, lower emissions, and ultimately reduce your boiler operating costs.

• Superheating raises overall efficiency as well as avoids too much condensation in last stages of turbine which avoids blade erosion.
• The heat of combustion gases from furnace is utilised for removal of moisture from steam and to superheat the steam.
• Super-heaters ususlly have several tube circuits in parallel with one or more return bends,connected between headers.
• Heat from the hot gases to the vapour in the surperheater is transferred at high temperatures.
• Therefore promary section of superheater is arranged in counterflow and secondary section in parallel flow to reduce the temp.stressing of the tube wall.

Product Parameters

Description Boiler economizer
Material Alloy steel, Carbon steel, SA210C ,SA213T22, etc.
Material standard ASTM, GB or as request etc.
Dimension Customization
Weight

Min: 10 ton

Max.:1000 ton

Smelting Process EF+LF + VD
Process Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →rough machining→UT →2nd Heat treatment →finishing machining →Inspection
UT standard ASTM A388 or EN10228, etc

Packaging & Shipping

Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler·For special cargos, such as overlength, overwidth, overheight and overweight cargos, we will choose frame boxes for easy handling.
·For regular goods, we prefer ordinary containers.
·After loading the goods, we will reinforce them in all aspects.

Company Profile

 
Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler
Zhangjiagang Hua Dong Boiler Co., Ltd.,
founded in 1985, is an enterprise specializing in manufacturing power station boilers, industrial boilers, HRSGs, waste incineration boilers, biomass boilers and related heating surface components in China. Hua Dong Boiler provides clients with integrated services from 
design, manufacturing to installation and maintenance.
 

Our Advantages

Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler
Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler

38 years experience in industry research, development and manufacturing with sufficient production capacity.

Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas BoilerQuality Control
1. Impact test and Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and electrode
3. X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler
4. Hydraulic test report: ensure the standard working pressure and safety.

Complete quality assurance and control system which certified according to the International Quality Standard.
Establish a quality assurance system faithfully in compliance with the national regulations, standards and other technical requirements. The quality of process and products is 100% under control. Ensured all the products are manufactured faithfully in accordance with the contract requirements, national regulations and standards by stringent inspection and test over materials and products during manufacturing.
Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler

Certifications

Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler

Global Sales

Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler
Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler
Industrial Alloy Steel Carbon Steel Boiler Economizer Power Plant Exhaust Gas Boiler

FAQ

Q1: How long is the warranty period?

We provide 18 months warranty for all spare parts(exclude fragile parts).

Q2: How can we guarantee quality?
1) All machines are in strict accordance with the ISO quality and CE system requirements.
2) Each procedure is crafted by professional Skilled labour, followed by particular QC
3) All information of our products can be checked in efficient management system.

Q3: What can you buy from us?
CFB Boiler, HRSG Boiler, Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler superheater, Boiler membrane wall,
Boiler manifold headers and other pressure spare parts.


Q4: What kind of service do you provide?
Before sales:
Provide productinformations, market research forecasting, product customization,product processing,consultation and other services for your convenience.

After sales:
1. Technical training on according to customer requirements;
2. We promise replacement under warranty;
3. We promise to supply the maintenance spare parts;
4. Regular call back or visit customers;
5. On time response to mail and phone calls of your complaints or consultation.

Accepted Delivery Terms: FOB, CFR, CIF, EXW, FCA;
Accepted Payment Currency: USD, CNY;
Accepted Payment Type: T/T, L/C, MoneyGram, Western Union, Cash;
Language Spoken:English,Chinese

Q5: Are you a factory or trading company, where are you located?
We are a factory, just 130km(2 hours by car) away from Shanghai Airport.
We offer pickup service at Shanghai for your visit.



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
203
Year of Establishment
1989-11-20