• Steel Boiler Parts Superheater Coil Heat Exchanger for Thermal Power Station
  • Steel Boiler Parts Superheater Coil Heat Exchanger for Thermal Power Station
  • Steel Boiler Parts Superheater Coil Heat Exchanger for Thermal Power Station
  • Steel Boiler Parts Superheater Coil Heat Exchanger for Thermal Power Station
  • Steel Boiler Parts Superheater Coil Heat Exchanger for Thermal Power Station
  • Steel Boiler Parts Superheater Coil Heat Exchanger for Thermal Power Station

Steel Boiler Parts Superheater Coil Heat Exchanger for Thermal Power Station

Certification: ISO, ASME and En
Customized: Customized
Surface Treatment: Painted
Fuel: Coal
Range of Applications: Power station, Industrial
Product Name: Boiler Superheater
Customization:
Gold Member Since 2024

Suppliers with verified business licenses

Jiangsu, China
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Standardized quality control
The supplier has a complete and standardized quality control process, check the Audit Report for more information
R&D Capabilities
The supplier has 10 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (25)
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Company Profile
Overview

Basic Info.

Model NO.
HDBSH01
Application
Power Station and Sugar Mill
Material
SA192 and SA36
Production Technique
Tube Bending
Keyword
Superheater Coil
Standard
ASME, GB, En
Transport Package
Steel Frame
Specification
L9582mm*W2100mm*H1958mm
Origin
China
HS Code
8402900000
Production Capacity
9000 Tons/Year

Product Description

Product Description

 

For power plant boiler, it is a crucial way to increase thermal economy of thermal power station by improving parameter of superheated steam. The increase of superheated steam parameters are limited by metal materials. The design of superheaters must make sure that the temperature of outer wall of heating surface pipes is lower than allowable temperature of oxidation resistance of steel, and meanwhile make sure its mechanical strength. with the development of metal material used in boilers, power station boilers in our country already generally apply high pressure, high temperature(9.8MPa, 540 degrees) and superhigh pressure parameters(13.7 MPa, 540 and 555 degrees), and have developed subcritical pressure parameters(16.7MPa, 540 and 555 degrees). Now lots of boilers apply supercritical pressure parameters(24.5MPa, 540-570 degrees), and even very few units apply higher pressure and temperature parameters.

 

With the increase of steam pressure, in order to reduce the steam humidity of steam turbine tail as well as further improve the thermal economy of power station, middle reheating system is widely used in high parameters power station, e.g. sending the exhaust of the high pressure cylinder in steam turbine again back to be re-heated in the boiler to high temperature, and then re-sending them back to the medium-pressure and low-pressure cylinder of the steam turbine, expanding and working. The element for reheating is called reheater.

 

In general, steam heated in high pressure superheater is named superheated vapour, the steam heated by reheater is called reheated vapour. The parameter of reheated steam is relating with economy of thermal circulation. Generally, the pressure of reheated steam is about one fifth of that of superheated steam, and the temperature of the former is almost the same as that of the latter. For example, in our nation for boiler with 125MW, 400t/h, the parameter for superheated steam is 133.7Mpa and 555 degrees; the inlet and outlet pressure of reheated steam is 2.5/2.35MPa, their temperature is 555 degrees, too. For boilers with 200MW, 670t/h, the parameter of superheated steam is 13.7MPa, 540 degrees; the inlet and outlet pressures are 2.7/2.5Mpa, and the temperature is also 540 degrees. For subcritical pressure control circulation boilers with 300MW, 600MW, superheated steam parameter is 18.27Mpa, 540 degrees; the inlet and outlet pressures are 3.83/3.63MPa, the temperature is also 540 degrees. Application of steam reheating system can increase the thermal economy for power stations by 4-5%. In our country, units with capacity over 125MW all apply one time middle reheating system, and overseas, two times middle reheating systems are applied for some units with higher parameters.

 

In modern boilers, the heat absorption consumption of the superheaters and reheaters is over half of total heat absorption for the working fluid, thus the heating surfaces of superheaters and reheaters account for a large proportion in total heating surfaces of boilers, and they must be placed in the areas where smoke temperature is higher, the working conditions are the worst among all the heating surfaces.Tube wall temperature of the heating surfaces is close to the max. allowable temperature of steel, so the reasonable arrangement and design of superheaters and reheaters matter so much for economy and reliability to the while boiler. When it comes to their design, on the basis of assurance of safety and reliability of superheater and reheater, it is very necessary to save metal consumption at the best, especially to save usage of alloy steel.

 

Detailed Photos

Steel Boiler Parts Superheater Coil Heat Exchanger for Thermal Power Station

Steel Boiler Parts Superheater Coil Heat Exchanger for Thermal Power StationSteel Boiler Parts Superheater Coil Heat Exchanger for Thermal Power StationSteel Boiler Parts Superheater Coil Heat Exchanger for Thermal Power Station
Product Parameters
Material carbon steel, alloy steel , or durable heat steel
Tube OD 10-114mm
Tube W.T. 0.8mm- 15mm
Structure vertical or horizontal
Company Profile
HD Boiler established in 1985, Zhangjiagang Hua Dong Boiler Co., Ltd. (trading as HD Boiler), is a professional industrial manufacturer, producing utility boiler,industrial boiler,HRSG boiler and all kinds of boiler parts, such as waterwall panels, economizers, air preheaters, superheaters, headers, spiral fin tubes, H-fin tubes, heat pipes etc. HD Boiler is located in Dong Lai Industrial Park, east suburb of Zhang Jia Gang City. The plant's location is around 150km Expressway to Shanghai Port or 60km State Road to Suzhou or Wuxi, with transportation extending in all directions conveniently and quickly.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
203
Year of Establishment
1989-11-20