Customization: | Available |
---|---|
Certification: | ISO |
Customized: | Customized |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The boiler economizer is a very important component in the boiler, which is usually installed in the tail flue of the boiler, adjacent to the air preheater. According to different structural forms and use occasions, the boiler economizers can be divided into different types. The common ones are light tube economizers, fin economizers, membrane economizers, etc. Among them, the plain tube economizer is the simplest form, which is mainly composed of a series of straight pipes, while the fin economizer and membrane economizer add fins or diaphragms on the basis of the plain tube economizer respectively to improve the heat transfer efficiency.
Features
Description |
Boiler economizer |
---|---|
Material | Alloy steel, Carbon steel, SA210C ,SA213T22, etc. |
Material standard | ASTM, EN or ISO etc. |
Dimension | Customization |
Weight |
Min: 10 ton Max.:1000 ton |
Smelting Process | EF+LF + VD |
Process | Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →rough machining→UT →2nd Heat treatment →finishing machining →Inspection |
UT standard | ASTM A388 or EN10228, etc |
Function
1. Absorb the heat of low-temperature flue gas, reduce the exhaust temperature, reduce the exhaust loss, and save fuel.
2. Because the feed water is heated in the economizer before entering the steam drum, the heat absorption of the feed water on the heating surface is reduced, and the economizer can be used to replace part of the evaporation heating surface with high cost.
3. When the feed water temperature increases, the wall temperature difference will be reduced when it enters the steam drum, and the thermal stress will be reduced accordingly, prolonging the service life of the steam drum.
Energy-saving principle
Add a reheating process to the cycle. Increase the average temperature of endothermy. This increases the efficiency of the cycle. During the start-up process of the boiler (drum boiler), because the circulation of its steam-water pipeline is not established, that is, the boiler feed water is in a stagnant state, and the water in the economizer is in a state of non-flow at this time. With the strengthening of boiler combustion and the increase of flue gas temperature, the water in the economizer is easy to vaporize, so that the part of the economizer is in an overtemperature state. In order to avoid this situation, a pipe is connected from the centralized sewer pipe of the steam drum to the inlet of the economizer as a recirculation pipe, so that the water in the economizer is in a flowing state to avoid its vaporization.
Boiler Economizer will be packaged using high-quality materials to ensure the safety and protection of the product during transportation. The packaging materials will be sturdy and durable, able to withstand rough handling and long-distance shipping.
The product will be carefully packed and cushioned to prevent any damage during transit. It will also be labeled with clear instructions and handling guidelines for easy identification and handling.
For shipping, we will use reliable and reputable carriers to ensure timely delivery of the product to our customers. We offer various shipping options depending on the destination, including air, sea, and land transportation.
Our team will also provide tracking information for customers to track their orders and ensure a smooth delivery process. We are committed to delivering the Boiler Economizer in perfect condition and on time.
Thank you for choosing our product. We look forward to providing you with the best packaging and shipping experience for your Boiler Economizer.
Why Choose Our Boiler Economizer?
Contact Us
If you are looking for a reliable and high-quality Boiler Economizer, look no further than HD Boiler. Contact us today to learn more and to place your order!
A: The brand name of this product is HD Boiler.
A: The model number of this product is Boiler economizer.
A: This product is made in China.
A: This product is certified by ASME, ISO9001:2015, and ISOEN3834.
A: The minimum order quantity for this product is 3 tons.
A: Yes, the price for this product is negotiable.
A: This product is packaged in iron frames.
A: The delivery time for this product depends on the quantity ordered.
A: The payment terms for this product are 30% after contract and balance 70% before shipment, or 100% L/C at sight.
A: The supply ability for this product is 100 tons per month.