Customization: | Available |
---|---|
Certification: | CE, ISO |
Customized: | Customized |
Still deciding? Get samples of US$ 100/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
An evaporator surface structure of a circulating fluidized bed boiler, the evaporator surface structure comprising: a furnace that is enclosed by sidewalls and has a bottom and a ceiling; and at least one vertical evaporator surface unit that is separate from and spaced apart from the sidewalls of the furnace, the at least one evaporator surface unit (i) being formed of planar water tube panels, formed by joining a group of water tubes by means of fins, that extend from the bottom of the furnace to the ceiling of the furnace, and (ii) consisting of two water tube panels that are connected to each other in a cross-wise configuration, wherein the water tube panels in each evaporator surface unit are suspended to hang from separate outlet headers arranged at different heights parallel with the water tube panels.
Quality Control
1. Impact test and Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and electrode.
3. X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler.
4. Hydraulic test report: ensure the standard working pressure and safety.
Packaging & Shipping
·For special cargos, such as overlength, overwidth, overheight and overweight cargos, we will choose frame boxes for easy handling.
·For regular goods, we prefer ordinary containers.
·After loading the goods, we will reinforce them in all aspects.
Zhangjiagang Hua Dong Boiler Co., Ltd.,
founded in 1985, is an enterprise specializing in manufacturing power station boilers, industrial boilers, HRSGs, waste incineration boilers, biomass boilers and related heating surface components in China. Hua Dong Boiler provides clients with integrated services from design, manufacturing to installation and maintenance.
Complete quality assurance and control system which certified according to the International Quality Standard.
Establish a quality assurance system faithfully in compliance with the national regulations, standards and other technical requirements. The quality of process and products is 100% under control. Ensured all the products are manufactured faithfully in accordance with the contract requirements, national regulations and standards by stringent inspection and test over materials and products during manufacturing.
Global Sales
FAQ
Q1: How long is the warranty period?