ODM CS Steam Superheater Coils in Boiler Heat Exchanger Accessories

Product Details
Customization: Available
Certification: CE, ISO
Customized: Customized
Still deciding? Get samples of US$ 100/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Standardized quality control
The supplier has a complete and standardized quality control process, check the Audit Report for more information
R&D Capabilities
The supplier has 10 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (25)
  • ODM CS Steam Superheater Coils in Boiler Heat Exchanger Accessories
  • ODM CS Steam Superheater Coils in Boiler Heat Exchanger Accessories
  • ODM CS Steam Superheater Coils in Boiler Heat Exchanger Accessories
  • ODM CS Steam Superheater Coils in Boiler Heat Exchanger Accessories
  • ODM CS Steam Superheater Coils in Boiler Heat Exchanger Accessories
  • ODM CS Steam Superheater Coils in Boiler Heat Exchanger Accessories
Find Similar Products
  • Overview
  • Product Description
  • Our Advantages
  • Packaging & Shipping
  • Company Profile
  • Certifications
Overview

Basic Info.

Model NO.
HDB Superheater
Surface Treatment
Painted
Fuel
Coal
Range of Applications
Power station, Industrial
Parts Type
Heating Elements
Structure
Hot / Water Tube
Usage
Industrial Boiler
Function
Energy Saving
Pressure
Hight Pressure
Trade Mark
HD Boiler
Material
Alloy Steel, Carbon Steel, Stainless Steel etc.
Transport Package
Customized
Specification
Customized
Trademark
HDB
Origin
China
HS Code
8404101090
Production Capacity
7500tons/Year

Packaging & Delivery

Package Size
200.00cm * 180.00cm * 180.00cm
Package Gross Weight
3000.000kg
Lead Time
30 days (1 - 10 Tons)
To be negotiated ( > 10 Tons)

Product Description

Product Description
ODM CS Steam Superheater Coils in Boiler Heat Exchanger Accessories
ODM CS Steam Superheater Coils in Boiler Heat Exchanger Accessories

ODM CS Steam Superheater Coils in Boiler Heat Exchanger Accessories
 Superheating raises overall efficiency as well as avoids too much condensation in last stages of turbine which avoids blade erosion.
• The heat of combustion gases from furnace is utilised for removal of moisture from steam and to superheat the steam.
• Super-heaters ususlly have several tube circuits in parallel with one or more return bends,connected between headers.
• Heat from the hot gases to the vapour in the surperheater is transferred at high temperatures.
• Therefore promary section of superheater is arranged in counterflow and secondary section in parallel flow to reduce the temp. stressing of the tube wall.

Difference
Type Advantages Disadvantages Supporting method
Pendant-type 1.Firm structural support 1. Flow blockage by condensed steam     
2. Needs slow restart to purge the water that accumulates in the bottom.
supported from above
Inverted-type 1.Proper drainage of the condensed steam 1. Lack the structural rigidity, especially in high speed gas flow. Supported from below
Horizontal -type 1. Proper drainage
2. Good structural rigidity.
1. They do not view the flam directly so they are mainly from the convective type. Usually supported in the vertical gas ducts parallel to the main furnace.
Our Advantages

Superheating system Superheater Coil

  • Superheaters in large capacity boilers are of both convective and radiant type.
  • The convective type superheaters are placed in the second pass of the boiler, and these are also called low temperature super heaters. Generally about a 40 to 60 degree centigrade temperature pick up takes place on the steam side in this superheater.
  • The steam from this moves to a radiant type superheater called the panel or platen superheater, and about a 70 to 100 degree centigrade pickup take place there.
  • This is followed by the final superheater, and the remaining required temperature is picked up here. One has to understand that the designer can vary the pickup pattern depending upon his way of practice or requirement.
  • But in all the methods adopted, the final temperature must be within a narrow range generally plus / minus five degrees centigrade. The superheaters are so surfaced that, for the design fuel of the boiler, there will not be any desuperheating requirement.
 

Quality Control

1. Impact test and Strength calculation report with applied materials information.

2. 100%NDT(non-destructive inspection) report of steel plate, tube and electrode.

3. X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler.

4. Hydraulic test report: ensure the standard working pressure and safety.

ODM CS Steam Superheater Coils in Boiler Heat Exchanger Accessories
Packaging & Shipping

ODM CS Steam Superheater Coils in Boiler Heat Exchanger AccessoriesPackaging & Shipping

·For special cargos, such as overlength, overwidth, overheight and overweight cargos, we will choose frame boxes for easy handling.
·For regular goods, we prefer ordinary containers.
·After loading the goods, we will reinforce them in all aspects.

Company Profile

Zhangjiagang Hua Dong Boiler Co., Ltd.,
founded in 1985, is an enterprise specializing in manufacturing power station boilers, industrial boilers, HRSGs, waste incineration boilers, biomass boilers and related heating surface components in China. Hua Dong Boiler provides clients with integrated services from design, manufacturing to installation and maintenance.
Complete quality assurance and control system which certified according to the International Quality Standard.
Establish a quality assurance system faithfully in compliance with the national regulations, standards and other technical requirements. The quality of process and products is 100% under control. Ensured all the products are manufactured faithfully in accordance with the contract requirements, national regulations and standards by stringent inspection and test over materials and products during manufacturing.

Certifications

ODM CS Steam Superheater Coils in Boiler Heat Exchanger Accessories
Global Sales

ODM CS Steam Superheater Coils in Boiler Heat Exchanger Accessories
ODM CS Steam Superheater Coils in Boiler Heat Exchanger Accessories
ODM CS Steam Superheater Coils in Boiler Heat Exchanger Accessories

FAQ

Q1: How long is the warranty period?

We provide 18 months warranty for all spare parts(exclude fragile parts).

Q2: How can we guarantee quality?
1) All machines are in strict accordance with the ISO quality and CE system requirements.
2) Each procedure is crafted by professional Skilled labour, followed by particular QC
3) All information of our products can be checked in efficient management system.

Q3: What can you buy from us?
CFB Boiler, HRSG Boiler, Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler superheater, Boiler membrane wall,
Boiler manifold headers and other pressure spare parts.


Q4: What kind of service do you provide?
Before sales:
Provide productinformations, market research forecasting, product customization,product processing,consultation and other services for your convenience.

After sales:
1. Technical training on according to customer requirements;
2. We promise replacement under warranty;
3. We promise to supply the maintenance spare parts;
4. Regular call back or visit customers;
5. On time response to mail and phone calls of your complaints or consultation.

Accepted Delivery Terms: FOB, CFR, CIF, EXW, FCA;
Accepted Payment Currency: USD, CNY;
Accepted Payment Type: T/T, L/C, MoneyGram, Western Union, Cash;
Language Spoken:English,Chinese
Q5: Are you a factory or trading company, where are you located?
We are a factory, just 130km(2 hours by car) away from Shanghai Airport.
We offer pickup service at Shanghai for your visit.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier