• Waste Heat Boiler Evaporator Heat Exchange Sugar Mill
  • Waste Heat Boiler Evaporator Heat Exchange Sugar Mill
  • Waste Heat Boiler Evaporator Heat Exchange Sugar Mill
  • Waste Heat Boiler Evaporator Heat Exchange Sugar Mill
  • Waste Heat Boiler Evaporator Heat Exchange Sugar Mill
  • Waste Heat Boiler Evaporator Heat Exchange Sugar Mill

Waste Heat Boiler Evaporator Heat Exchange Sugar Mill

Certification: ISO, ASME
Customized: Customized
Surface Treatment: Painted
Fuel: Biomass, Coal, Gas, Waste
Range of Applications: Power station, Industrial
Type: Heating Element
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2024

Suppliers with verified business licenses

Jiangsu, China
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Standardized quality control
The supplier has a complete and standardized quality control process, check the Audit Report for more information
R&D Capabilities
The supplier has 10 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (25)
  • Overview
  • Product Description
  • Product Parameters
  • Packaging & Shipping
  • Company Profile
  • Our Advantages
  • Certifications
  • Global Sales
  • FAQ
Overview

Basic Info.

Model NO.
Boiler Evaporator
Material
Stainless Steel, Carbon Steel, Alloy Steel
Machinery Test Report
Provide
Supply Ability
500 Tons Per Month
Structure
Water Tube
Application
Industrial / Power Station
Transport Package
Iron Frame
Specification
Customized
Trademark
HD BOILER
Origin
China
HS Code
8402900000

Product Description

Waste Heat Boiler Evaporator Heat Exchange Sugar Mill 

 

Product Description

Power plant boiler evaporator is one of the key components in the process of electric power generation, its main role is to heat the water entering the boiler and evaporate into high temperature and high pressure steam to supply the generator set to drive the turbine to generate electricity.

In addition, what is the role of the power plant boiler evaporator, and what are the roles of the power plant boiler evaporator:

1. Energy saving and emission reduction: The power plant boiler evaporator uses efficient heating methods, such as coal, gas, oil and other fuel combustion heating, nuclear heating, etc., which can achieve efficient use of energy and reduce pollutant emissions.

2. Ensure the safe operation of the power station: the boiler evaporator is one of the important safety devices in the power station, which can effectively control the temperature and pressure of the boiler, avoid the occurrence of boiler explosion and other accidents, and ensure the safe operation of the power station.

3. Increase power generation efficiency: the power plant boiler evaporator can evaporate water into high temperature and high pressure steam, providing power for the generator set and improving power generation efficiency.

4. Extend the life of the equipment: The power plant boiler evaporator uses an efficient heating method, which can reduce the wear and corrosion of the equipment and extend the service life of the equipment.

Power plant boiler evaporator plays a very important role in the process of electric power generation. What is the role of the power plant boiler evaporator, it can ensure the safe operation of the power station, improve the efficiency of power generation, but also can achieve energy saving and emission reduction and extend the life of the equipment and other benefits.

Waste Heat Boiler Evaporator Heat Exchange Sugar Mill

Product Parameters

Description Boiler evaporator
Material Alloy steel, Carbon steel, SA210C ,SA213T22, etc.
Material standard ASTM, GB or as request etc.
Dimension Customization
Weight

Min: 10 ton

Max.:1000 ton

Smelting Process EF+LF + VD
Process Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →rough machining→UT →2nd Heat treatment →finishing machining →Inspection
UT standard ASTM A388 or EN10228, etc

Packaging & Shipping

Waste Heat Boiler Evaporator Heat Exchange Sugar Mill·For special cargos, such as overlength, overwidth, overheight and overweight cargos, we will choose frame boxes for easy handling.
·For regular goods, we prefer ordinary containers.
·After loading the goods, we will reinforce them in all aspects.

Company Profile

 
Waste Heat Boiler Evaporator Heat Exchange Sugar Mill
Zhangjiagang Hua Dong Boiler Co., Ltd.,
founded in 1985, is an enterprise specializing in manufacturing power station boilers, industrial boilers, HRSGs, waste incineration boilers, biomass boilers and related heating surface components in China. Hua Dong Boiler provides clients with integrated services from 
design, manufacturing to installation and maintenance.
 

Our Advantages

Waste Heat Boiler Evaporator Heat Exchange Sugar Mill
Waste Heat Boiler Evaporator Heat Exchange Sugar Mill

38 years experience in industry research, development and manufacturing with sufficient production capacity.

Waste Heat Boiler Evaporator Heat Exchange Sugar MillQuality Control
1. Impact test and Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and electrode
3. X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler
4. Hydraulic test report: ensure the standard working pressure and safety.

Complete quality assurance and control system which certified according to the International Quality Standard.
Establish a quality assurance system faithfully in compliance with the national regulations, standards and other technical requirements. The quality of process and products is 100% under control. Ensured all the products are manufactured faithfully in accordance with the contract requirements, national regulations and standards by stringent inspection and test over materials and products during manufacturing.
Waste Heat Boiler Evaporator Heat Exchange Sugar Mill

Certifications

Waste Heat Boiler Evaporator Heat Exchange Sugar Mill

Global Sales

Waste Heat Boiler Evaporator Heat Exchange Sugar Mill
Waste Heat Boiler Evaporator Heat Exchange Sugar Mill
Waste Heat Boiler Evaporator Heat Exchange Sugar Mill

FAQ

Q1: How long is the warranty period?

We provide 18 months warranty for all spare parts(exclude fragile parts).

Q2: How can we guarantee quality?
1) All machines are in strict accordance with the ISO quality and CE system requirements.
2) Each procedure is crafted by professional Skilled labour, followed by particular QC
3) All information of our products can be checked in efficient management system.

Q3: What can you buy from us?
CFB Boiler, HRSG Boiler, Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler superheater, Boiler membrane wall,
Boiler manifold headers and other pressure spare parts.


Q4: What kind of service do you provide?
Before sales:
Provide productinformations, market research forecasting, product customization,product processing,consultation and other services for your convenience.

After sales:
1. Technical training on according to customer requirements;
2. We promise replacement under warranty;
3. We promise to supply the maintenance spare parts;
4. Regular call back or visit customers;
5. On time response to mail and phone calls of your complaints or consultation.

Accepted Delivery Terms: FOB, CFR, CIF, EXW, FCA;
Accepted Payment Currency: USD, CNY;
Accepted Payment Type: T/T, L/C, MoneyGram, Western Union, Cash;
Language Spoken:English,Chinese

Q5: Are you a factory or trading company, where are you located?
We are a factory, just 130km(2 hours by car) away from Shanghai Airport.
We offer pickup service at Shanghai for your visit.



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
203
Year of Establishment
1989-11-20